dc.contributor.author |
Maddah B.S. |
dc.contributor.author |
Jaber M.Y. |
dc.contributor.author |
Abboud N.E. |
dc.contributor.editor |
|
dc.date |
2004 |
dc.date.accessioned |
2017-10-04T11:06:34Z |
dc.date.available |
2017-10-04T11:06:34Z |
dc.date.issued |
2004 |
dc.identifier |
10.1057/palgrave.jors.2601675 |
dc.identifier.isbn |
|
dc.identifier.issn |
01605682 |
dc.identifier.uri |
http://hdl.handle.net/10938/13988 |
dc.description.abstract |
This paper investigates the effect of permissible delay in payments on ordering policies in a periodic review (s, S) inventory model with stochastic demand. A new mathematical model is developed, which is an extension to that of Veinott and Wagner (Mngt Sci 1965; 11: 525) who applied renewal theory and stationary probabilistic analysis to determine the equivalent average cost per review period. The performance of the model is validated using a custom-built simulation programme. In addition, two distribution-free heuristic methods of reasonable accuracy develop approximate optimal policies for practical purposes based only on the mean and the standard deviation of the demand. Numerical examples are presented with results discussed. |
dc.format.extent |
|
dc.format.extent |
Pages: (147-159) |
dc.language |
English |
dc.publisher |
BASINGSTOKE |
dc.relation.ispartof |
Publication Name: Journal of the Operational Research Society; Publication Year: 2004; Volume: 55; no. 2; Pages: (147-159); |
dc.relation.ispartofseries |
|
dc.relation.uri |
|
dc.source |
Scopus |
dc.subject.other |
|
dc.title |
Periodic review (s, S) inventory model with permissible delay in payments |
dc.type |
Conference Paper |
dc.contributor.affiliation |
Maddah, B.S., Virginia Tech, Blacksburg, VA, United States |
dc.contributor.affiliation |
Jaber, M.Y., Ryerson University, Toronto, Ont., Canada, Department of Mechanical Engineering, Ryerson University, Toronto, Ont. M5B 2K3, Canada |
dc.contributor.affiliation |
Abboud, N.E., American University of Beirut, Beirut, Lebanon |
dc.contributor.authorAddress |
Jaber, M.Y.; Department of Mechanical Engineering, Ryerson University, Toronto, Ont. M5B 2K3, Canada; email: mjaber@ryerson.ca |
dc.contributor.authorCorporate |
University: American University of Beirut; Faculty: Faculty of Engineering and Architecture; Department: Electrical and Computer Engineering; |
dc.contributor.authorDepartment |
Electrical and Computer Engineering |
dc.contributor.authorDivision |
|
dc.contributor.authorEmail |
mjaber@ryerson.ca |
dc.contributor.faculty |
Faculty of Engineering and Architecture |
dc.contributor.authorInitials |
Maddah, BS |
dc.contributor.authorInitials |
Jaber, MY |
dc.contributor.authorInitials |
Abboud, NE |
dc.contributor.authorOrcidID |
|
dc.contributor.authorReprintAddress |
Jaber, MY (reprint author), Ryerson Univ, Dept Mech and Ind Engn, Toronto, ON M5B 2K3, Canada. |
dc.contributor.authorResearcherID |
|
dc.contributor.authorUniversity |
American University of Beirut |
dc.description.cited |
AGGARWAL SP, 1995, J OPER RES SOC, V46, P658, DOI 10.1057-jors.1995.90; ARCELUS FJ, 1993, J OPER RES SOC, V44, P785, DOI 10.1057-jors.1993.137; Arrow KJ, 1951, ECONOMETRICA, V19, P250, DOI 10.2307-1906813; BANERJEE A, 1986, DECISION SCI, V17, P292, DOI 10.1111-j.1540-5915.1986.tb00228.x; CHAND S, 1987, J OPER RES SOC, V38, P83, DOI 10.2307-2582525; CHAPMAN CB, 1984, J OPER RES SOC, V35, P1055, DOI 10.2307-2582093; Chu P, 1998, COMPUT OPER RES, V25, P817, DOI 10.1016-S0305-0548(98)00006-9; CHUNG KH, 1989, J OPER RES SOC, V40, P495; Chung KJ, 1998, COMPUT OPER RES, V25, P49, DOI 10.1016-S0305-0548(97)00041-5; DAVIS RA, 1985, MANAGE SCI, V31, P499, DOI 10.1287-mnsc.31.4.499; EHRHARDT R, 1979, MANAGE SCI, V25, P777, DOI 10.1287-mnsc.25.8.777; EHRHARDT R, 1984, MANAGE SCI, V30, P618, DOI 10.1287-mnsc.30.5.618; FEDERGRUEN A, 1984, OPER RES, V32, P1268, DOI 10.1287-opre.32.6.1268; Fu MC, 1997, IIE TRANS, V29, P191; GOYAL SK, 1985, J OPER RES SOC, V36, P335, DOI 10.2307-2582421; HALEY CW, 1973, MANAGE SCI B-APPL, V20, P464, DOI 10.1287-mnsc.20.4.464; Hwang H, 1997, COMPUT OPER RES, V24, P539, DOI 10.1016-S0305-0548(96)00069-X; IGLEHART DL, 1963, MANAGE SCI, V9, P259, DOI 10.1287-mnsc.9.2.259; JAGGI CK, 1994, INT J PROD ECON, V34, P151, DOI 10.1016-0925-5273(94)90031-0; Jamal AMM, 1997, J OPER RES SOC, V48, P826, DOI 10.2307-3010710; Jamal AMM, 2000, INT J PROD ECON, V66, P59, DOI 10.1016-S0925-5273(99)00108-5; Johansen SG, 1999, INT J PROD ECON, V59, P405, DOI 10.1016-S0925-5273(98)00107-8; Khouja M, 1996, J MANUF SYST, V15, P334, DOI 10.1016-0278-6125(96)84196-3; KIM J, 1995, PROD PLAN CONTROL, V6, P45, DOI 10.1080-09537289508930252; KINGSMAN BG, 1983, J OPER RES SOC, V34, P1085, DOI 10.2307-2581018; Law A., 1991, SIMULATION MODELING; Liao HC, 2000, INT J PROD ECON, V63, P207, DOI 10.1016-S0925-5273(99)00015-8; RACHAMADUGU R, 1989, J OPER RES SOC, V40, P805, DOI 10.1057-jors.1989.143; SAHIN I, 1989, REGENERATIVE INVENTO; Sarker BR, 2000, COMPUT OPER RES, V27, P59, DOI 10.1016-S0305-0548(99)00008-8; SCHNEIDER H, 1990, MANAGE SCI, V36, P822, DOI 10.1287-mnsc.36.7.822; Shah V. R., 1996, Opsearch, V33; Shinn SW, 1996, EUR J OPER RES, V91, P528; Shinn SW, 1997, COMPUT IND ENG, V33, P717, DOI 10.1016-S0360-8352(97)00230-1; Silver E.A., 1998, INVENTORY MANAGEMENT; Teng JT, 2002, J OPER RES SOC, V53, P915, DOI 10.1057-palgrave.jors.2601410; VEINOTT AF, 1965, MANAGE SCI, V11, P525, DOI 10.1287-mnsc.11.5.525; Wagner H. M., 1975, PRINCIPLES OPERATION; ZHENG YS, 1991, OPER RES, V39, P654, DOI 10.1287-opre.39.4.654 |
dc.description.citedCount |
17 |
dc.description.citedTotWOSCount |
19 |
dc.description.citedWOSCount |
12 |
dc.format.extentCount |
13 |
dc.identifier.articleNo |
|
dc.identifier.coden |
JORSD |
dc.identifier.pubmedID |
|
dc.identifier.scopusID |
2342450074 |
dc.identifier.url |
|
dc.publisher.address |
BRUNEL RD BLDG, HOUNDMILLS, BASINGSTOKE RG21 6XS, HANTS, ENGLAND |
dc.relation.ispartofConference |
|
dc.relation.ispartofConferenceCode |
|
dc.relation.ispartofConferenceDate |
|
dc.relation.ispartofConferenceHosting |
|
dc.relation.ispartofConferenceLoc |
|
dc.relation.ispartofConferenceSponsor |
|
dc.relation.ispartofConferenceTitle |
|
dc.relation.ispartofFundingAgency |
|
dc.relation.ispartOfISOAbbr |
J. Oper. Res. Soc. |
dc.relation.ispartOfIssue |
2 |
dc.relation.ispartOfPart |
|
dc.relation.ispartofPubTitle |
Journal of the Operational Research Society |
dc.relation.ispartofPubTitleAbbr |
J Oper Res Soc |
dc.relation.ispartOfSpecialIssue |
|
dc.relation.ispartOfSuppl |
|
dc.relation.ispartOfVolume |
55 |
dc.source.ID |
WOS:000188741300007 |
dc.type.publication |
Journal |
dc.subject.otherAuthKeyword |
(s, S) policy |
dc.subject.otherAuthKeyword |
Heuristicse |
dc.subject.otherAuthKeyword |
Periodic review |
dc.subject.otherAuthKeyword |
Permissible delay in payments-supplier credit |
dc.subject.otherAuthKeyword |
Service level |
dc.subject.otherAuthKeyword |
Simulation |
dc.subject.otherAuthKeyword |
Stochastic demand |
dc.subject.otherChemCAS |
|
dc.subject.otherIndex |
Approximation theory |
dc.subject.otherIndex |
Costs |
dc.subject.otherIndex |
Data acquisition |
dc.subject.otherIndex |
Decision making |
dc.subject.otherIndex |
Heuristic methods |
dc.subject.otherIndex |
Mathematical models |
dc.subject.otherIndex |
Probabilistic logics |
dc.subject.otherIndex |
Stochastic control systems |
dc.subject.otherIndex |
(s, S) policy |
dc.subject.otherIndex |
Periodic review |
dc.subject.otherIndex |
Permissible delay in payments-supplier credit |
dc.subject.otherIndex |
Service level |
dc.subject.otherIndex |
Stochastic demand |
dc.subject.otherIndex |
Inventory control |
dc.subject.otherKeywordPlus |
ECONOMIC ORDER QUANTITY |
dc.subject.otherKeywordPlus |
POWER APPROXIMATION |
dc.subject.otherKeywordPlus |
TRADE CREDIT |
dc.subject.otherKeywordPlus |
LOT-SIZE |
dc.subject.otherKeywordPlus |
SUPPLIER CREDIT |
dc.subject.otherKeywordPlus |
S, S POLICIES |
dc.subject.otherKeywordPlus |
PRICE |
dc.subject.otherKeywordPlus |
INFLATION |
dc.subject.otherKeywordPlus |
PRODUCTS |
dc.subject.otherWOS |
Management |
dc.subject.otherWOS |
Operations Research and Management Science |