An analytical approach to estimate the expected duration and variance for iterative product development projects

dc.contributor.authorNasr, Walid W.
dc.contributor.authorYassine, Ali A.
dc.contributor.authorAbou Kasm, Omar
dc.contributor.departmentDepartment of Industrial Engineering and Management
dc.contributor.facultyMaroun Semaan Faculty of Engineering and Architecture (MSFEA)
dc.contributor.institutionAmerican University of Beirut
dc.date.accessioned2025-01-24T11:31:44Z
dc.date.available2025-01-24T11:31:44Z
dc.date.issued2016
dc.description.abstractThe paper presents an analytical method for finding the expected duration and variance of a product development (PD) project network. A PD project network is a stochastic activity network (such as a PERT network) which allows for probabilistic repetition of activities (i.e., activity rework). When rework is allowed, estimating the process duration and variance becomes difficult. Most existing literature refers to the use of simulation in such scenarios; however, few analytical methods exist to solve this problem. One such method is called the reward Markov chain (RMC) which only considers sequential activity networks and which we use as a starting point in our proposed method. In this paper, we extend the RMC method to solve mixed networks (i.e., a combination of parallel and sequential activities) and more complicated practical issues that may arise in PD environments, specifically coupled activities and parallel rework. © 2015, Springer-Verlag London.
dc.identifier.doihttps://doi.org/10.1007/s00163-015-0205-0
dc.identifier.eid2-s2.0-84953364123
dc.identifier.urihttp://hdl.handle.net/10938/27559
dc.language.isoen
dc.publisherSpringer-Verlag London Ltd
dc.relation.ispartofResearch in Engineering Design
dc.sourceScopus
dc.subjectActivity rework
dc.subjectDesign structure matrix (dsm)
dc.subjectIteration
dc.subjectProduct development
dc.subjectProject networks
dc.subjectComputer supported cooperative work
dc.subjectCritical path analysis
dc.subjectMarkov processes
dc.subjectProduct design
dc.subjectProject management
dc.subjectStochastic systems
dc.subjectAnalytical approach
dc.subjectDesign structure matrices
dc.subjectIterative product development
dc.subjectReward markov chain
dc.subjectSequential activities
dc.subjectStochastic activity networks
dc.subjectIterative methods
dc.titleAn analytical approach to estimate the expected duration and variance for iterative product development projects
dc.typeArticle

Files

Original bundle

Now showing 1 - 1 of 1
Loading...
Thumbnail Image
Name:
2016-9889.pdf
Size:
1.3 MB
Format:
Adobe Portable Document Format