Understanding the role of tasks anticipated in lookahead planning through simulation

dc.contributor.authorHamzeh, Farook R.
dc.contributor.authorSaab, Issa
dc.contributor.authorTommelein, Iris D.
dc.contributor.authorBallard, Glenn
dc.contributor.departmentDepartment of Civil and Environmental Engineering
dc.contributor.facultyMaroun Semaan Faculty of Engineering and Architecture (MSFEA)
dc.contributor.institutionAmerican University of Beirut
dc.date.accessioned2025-01-24T11:26:50Z
dc.date.available2025-01-24T11:26:50Z
dc.date.issued2015
dc.description.abstractConstruction planning takes place at many levels. This paper pertains to the level called lookahead planning, during which planners make their plan more realistic as construction tasks approach execution. To improve the quality of lookahead planning, the construction industry has benefited from implementing the Last Planner® System (LPS) that emphasizes creating reliable workflow. Successful lookahead planning relies on task anticipation by breaking down tasks to the level of operations, designing those operations, and making tasks ready by identifying and removing their constraints so that tasks can become executable assignments. This paper presents a study, using computer simulation, of the relationship between improving Task Anticipated (TA) in lookahead planning and overall project duration. The results indicate that increasing TA can have a positive influence on reducing project duration. The authors recommend that industry practitioners use the TA metric to gauge their planning performance and then to improve on it. © 2014 Elsevier B.V. All rights reserved.
dc.identifier.doihttps://doi.org/10.1016/j.autcon.2014.09.005
dc.identifier.urihttp://hdl.handle.net/10938/26686
dc.language.isoen
dc.publisherElsevier B.V.
dc.sourceScopus
dc.subjectConstruction planning
dc.subjectLast planner® system
dc.subjectLean construction
dc.subjectLookahead planning
dc.subjectShort-term planning
dc.subjectSimulation
dc.subjectAutomation
dc.subjectCivil engineering
dc.subjectLast planner
dc.subjectShort term planning
dc.subjectConstruction industry
dc.titleUnderstanding the role of tasks anticipated in lookahead planning through simulation
dc.typeArticle

Files

Original bundle

Now showing 1 - 1 of 1
Loading...
Thumbnail Image
Name:
2015-10395.pdf
Size:
651.09 KB
Format:
Adobe Portable Document Format