Modular approach for optimal pipeline layout

dc.contributor.authorDbouk, Haytham M.
dc.contributor.authorHayek, Hussein
dc.contributor.authorGhorayeb, Kassem
dc.contributor.departmentDepartment of Chemical and Petroleum Engineering
dc.contributor.facultyMaroun Semaan Faculty of Engineering and Architecture (MSFEA)
dc.contributor.institutionAmerican University of Beirut
dc.date.accessioned2025-01-24T11:26:29Z
dc.date.available2025-01-24T11:26:29Z
dc.date.issued2021
dc.description.abstractOil and gas production systems are getting deeper, more complex, and far away offshore where energy companies are targeting further resources. These complexities are transforming the problem of field layout design optimization into a much more pressing need. Considering the various pipeline design and layout constraints and associated investment costs, planning and development of production gathering and transmission pipeline networks for oil and gas fields is gaining further importance in field development planning. The optimization of transmission and gathering pipeline networks is conducted to accommodate the encountered topological complexities and significantly reduce total investment cost for the corresponding fields. Although many optimization schemes are developed and widely available in literature, these methods are either prohibitively slow with exhaustive search required, or they don't account for the various topological complexities typically encountered in real scenarios. Thus, the deficiency associated to these optimization schemes becomes drastically more limiting in the case of a concept-select phase of field development planning where many scenarios need to be assessed in a relatively short timeframe. In this study, the optimal shortest path A* algorithm is introduced to the field of pipeline placement optimization. A* is successfully used in other applications such as unmanned aerial vehicle (UAV) and robots motion planning. A benchmark comparison is presented with the Dijkstra algorithm; another algorithm that assures optimal shortest path solution that was recently introduced into this field. This comparison is performed on a varied set of pipeline layout scenarios accounting for different topological complexities and dynamic conditions. The conducted tests show the superiority of the A* algorithm in terms of accounting for the application heuristics and assuring an optimal and efficient solution. © 2020 Elsevier B.V.
dc.identifier.doihttps://doi.org/10.1016/j.petrol.2020.107934
dc.identifier.eid2-s2.0-85092013862
dc.identifier.urihttp://hdl.handle.net/10938/26608
dc.language.isoen
dc.publisherElsevier B.V.
dc.relation.ispartofJournal of Petroleum Science and Engineering
dc.sourceScopus
dc.subjectA algorithm
dc.subjectDijkstra's algorithm
dc.subjectOil and gas pipeline layout
dc.subjectPipeline network optimization
dc.subjectShortest path
dc.subjectTopological complexity
dc.subjectAntennas
dc.subjectCosts
dc.subjectEconomics
dc.subjectGas industry
dc.subjectGraph theory
dc.subjectInvestments
dc.subjectOffshore gas fields
dc.subjectOffshore oil well production
dc.subjectOil field development
dc.subjectOptimization
dc.subjectPetroleum industry
dc.subjectRobot programming
dc.subjectUnmanned aerial vehicles (uav)
dc.subjectBenchmark comparison
dc.subjectDijkstra algorithms
dc.subjectGathering and transmission pipelines
dc.subjectOil and gas production systems
dc.subjectOptimization scheme
dc.subjectPlacement optimization
dc.subjectPlanning and development
dc.subjectAlgorithm
dc.subjectComplexity
dc.subjectDesign
dc.subjectGas pipeline
dc.subjectOil pipeline
dc.subjectRobotics
dc.subjectPipelines
dc.titleModular approach for optimal pipeline layout
dc.typeArticle

Files

Original bundle

Now showing 1 - 1 of 1
Loading...
Thumbnail Image
Name:
2021-6204.pdf
Size:
5.92 MB
Format:
Adobe Portable Document Format