Progression Analysis of the EJCDC's Underlying Claim and Dispute Resolution Mechanism

dc.contributor.authorBarakat, Mohammad
dc.contributor.authorKhoury, Hiam K.
dc.contributor.authorAbdul-Malak, Mohamed Asem U.
dc.contributor.departmentDepartment of Civil and Environmental Engineering
dc.contributor.facultyMaroun Semaan Faculty of Engineering and Architecture (MSFEA)
dc.contributor.institutionAmerican University of Beirut
dc.date.accessioned2025-01-24T11:27:10Z
dc.date.available2025-01-24T11:27:10Z
dc.date.issued2018
dc.description.abstractDirect negotiation is the most common approach used for cost-effective resolution of construction claims and disputes. From among the several available standard conditions of contract, those issued by the Engineers Joint Contract Documents Committee (EJCDC) call for a direct review and resolution process to be initiated immediately following the submission of a claim and supporting data by the claimant. To this effect, this paper tackles the examination of the claim process evolution under these conditions, starting with this rather long, time-barred stipulation. The used methodology relied on presenting the overall claim and dispute timeline then dissecting it in accordance with the possibilities prevailing at each of the timeline stages and their corresponding gates. Four different scenarios were identified, and their analysis revealed interesting observations along a number of characteristics. These mainly include: (1) the placement of the project owner at the forefront in deciding on actions pertaining to a contractor's submitted claims; (2) the staging of mediation as an alternative dispute resolution means early on in the timeline as an intermittent step that can possibly be taken in lieu of, and having the effect of suspending, the direct negotiation step; and (3) the advantage given to the action by the opposing party, on one hand, and to the denial of claim by the claimant, on the other hand, in triggering expeditious closure of or in moving forward with a case on hand, respectively. © 2018 American Society of Civil Engineers.
dc.identifier.doihttps://doi.org/10.1061/(ASCE)LA.1943-4170.0000263
dc.identifier.eid2-s2.0-85050320298
dc.identifier.urihttp://hdl.handle.net/10938/26810
dc.language.isoen
dc.publisherAmerican Society of Civil Engineers (ASCE)
dc.relation.ispartofJournal of Legal Affairs and Dispute Resolution in Engineering and Construction
dc.sourceScopus
dc.subjectCivil and structural engineering
dc.subjectSafety, risk, reliability and quality
dc.subjectEngineering (miscellaneous)
dc.subjectLaw
dc.titleProgression Analysis of the EJCDC's Underlying Claim and Dispute Resolution Mechanism
dc.typeArticle