AUB ScholarWorks
Search
AUB ScholarWorks Home
→
Suliman S. Olayan School of Business (OSB)
→
Search
JavaScript is disabled for your browser. Some features of this site may not work without it.
Search
Filters
Use filters to refine the search results.
Current Filters:
Title
Author
Subject
Date issued
Has File(s)
Filename
File description
Contains
Equals
ID
Not Contains
Not Equals
Not ID
New Filters:
Title
Author
Subject
Date issued
Has File(s)
Filename
File description
Contains
Equals
ID
Not Contains
Not Equals
Not ID
Showing 10 out of a total of 22 results for community: Suliman S. Olayan School of Business (OSB).
(0.01 seconds)
Now showing items 1-10 of 22
1
2
3
Next Page
Sort Options:
Relevance
Title Asc
Title Desc
Issue Date Asc
Issue Date Desc
Results Per Page:
5
10
20
40
60
80
100
Guided construction search metaheuristics for the capacitated p-median problem with single source constraint
Osman I.H.
;
Ahmadi S.
(
BASINGSTOKE
,
2007
)
Fast, effective heuristics for the 0-1 multi-dimensional knapsack problem
Fleszar K.
;
Hindi K.S.
(
OXFORD
,
2009
)
A branch-and-bound algorithm for single-machine scheduling with batch delivery and job release times
Mahdavi Mazdeh M.
;
Sarhadi M.
;
Hindi K.S.
(
OXFORD
,
2008
)
Integrating the economic production model with deteriorating raw material over multi-production cycles
Nasr W.W.
;
Salameh M.K.
;
Moussawi-Haidar L.
(
Taylor and Francis Ltd.; ABINGDON
,
2014
)
A variable neighbourhood search algorithm for the open vehicle routing problem
Fleszar K.
;
Osman I.H.
;
Hindi K.S.
(
AMSTERDAM
,
2009
)
Dynamic pricing for nonperishable products with demand learning
Araman V.F.
;
Caldentey R.
(
HANOVER
,
2009
)
Dynamic cruise ship revenue management
Maddah B.
;
Moussawi-Haidar L.
;
El-Taha M.
;
Rida H.
(
AMSTERDAM
,
2010
)
Three insertion heuristics and a justification improvement heuristic for two-dimensional bin packing with guillotine cuts
Fleszar K.
(
OXFORD
,
2013
)
An effective VNS for the capacitated p-median problem
Fleszar K.
;
Hindi K.S.
(
AMSTERDAM
,
2008
)
Solving the resource-constrained project scheduling problem by a variable neighbourhood search
Fleszar K.
;
Hindi K.S.
(
AMSTERDAM
,
2004
)
Now showing items 1-10 of 22
1
2
3
Next Page
Sort Options:
Relevance
Title Asc
Title Desc
Issue Date Asc
Issue Date Desc
Results Per Page:
5
10
20
40
60
80
100
Browse
All of AUB ScholarWorks
Communities & Collections
By Issue Date
Authors
Titles
Subjects
This Community
By Issue Date
Authors
Titles
Subjects
My Account
Login
Discover
Author
Fleszar K. (7)
Hindi K.S. (6)
Osman I.H. (6)
Ahmadi S. (3)
Maddah B. (3)
Moussawi-Haidar L. (3)
Nasr W.W. (3)
Araman V.F. (2)
Charalambous C. (2)
Salameh M.K. (2)
... View More
Subject
Operations Research and Management Science (22)
||| (15)
Management (10)
Engineering, Industrial (8)
Computer Science, Interdisciplinary Applications (6)
Heuristic methods (5)
Problem solving (5)
Algorithms (4)
Engineering, Manufacturing (4)
Heuristics (4)
... View More
Date Issued
2010 - 2014 (10)
2004 - 2009 (12)
Has File(s)
No (18)
Yes (4)