AUB ScholarWorks

Lot sizing with a Markov production process and imperfect items scrapped

Show simple item record

dc.contributor.author Maddah B.
dc.contributor.author Moussawi L.
dc.contributor.author Jaber M.Y.
dc.contributor.editor
dc.date 2010
dc.date.accessioned 2017-09-07T07:51:19Z
dc.date.available 2017-09-07T07:51:19Z
dc.date.issued 2010
dc.identifier 10.1016/j.ijpe.2009.11.029
dc.identifier.issn 9255273
dc.identifier.uri http://hdl.handle.net/10938/12082
dc.description.abstract This paper considers an inventory system within the economic order quantity (EOQ) model framework under random supply. The production process can go out-of-control with a constant probability and start producing imperfect quality items. Such a system has been studied in the literature under the assumption that defective items are reworked instantaneously and returned to inventory. In some situations, imperfect quality items are not necessarily defective and are removed from the inventory to be used elsewhere. This paper develops two models where imperfect items are removed from inventory. The first model finds the expected cost and optimal lot size assuming that imperfect quality items are removed from inventory at no cost. The second model assumes that batches of imperfect quality are consolidated and shipped together due to economies of scale in shipping. Analytical and numerical results are developed for both models revealing several managerial insights. © 2009 Elsevier B.V. All rights reserved.
dc.format.extent
dc.format.extent Pages: (340-347)
dc.language English
dc.publisher AMSTERDAM
dc.relation.ispartof Publication Name: International Journal of Production Economics; Publication Year: 2010; Volume: 124; no. 2; Pages: (340-347);
dc.source Scopus
dc.title Lot sizing with a Markov production process and imperfect items scrapped
dc.type Article
dc.contributor.affiliation Maddah, B., Engineering Management Program, American University of Beirut, P.O. Box 11-0236, Beirut 1107 2020, Lebanon
dc.contributor.affiliation Moussawi, L., Olayan School of Business, American University of Beirut, P.O. Box 11-0236, Beirut 1107 2020, Lebanon
dc.contributor.affiliation Jaber, M.Y., Department of Mechanical and Industrial Engineering, Ryerson University, Toronto, Ont. M5B 2K3, Canada
dc.contributor.authorAddress Maddah, B.; Engineering Management Program, American University of Beirut, P.O. Box 11-0236, Beirut 1107 2020, Lebanon; email: bacel.maddah@aub.edu.lb
dc.contributor.authorCorporate University: American University of Beirut; Faculty: Suliman S. Olayan School of Business; Department: School of Business;
dc.contributor.authorDepartment School of Business
dc.contributor.authorDivision
dc.contributor.authorEmail bacel.maddah@aub.edu.lb; lama.moussawi@aub.edu.lb; mjaber@ryerson.ca
dc.contributor.faculty Suliman S. Olayan School of Business
dc.contributor.authorInitials Maddah, B
dc.contributor.authorInitials Moussawi, L
dc.contributor.authorInitials Jaber, MY
dc.contributor.authorOrcidID
dc.contributor.authorReprintAddress Maddah, B (reprint author), Amer Univ Beirut, Engn Management Program, POB 11-0236, Beirut 11072020, Lebanon.
dc.contributor.authorResearcherID
dc.contributor.authorUniversity American University of Beirut
dc.description.cited Avriel M., 2003, NONLINEAR PROGRAMMIN; Cardenas-Barron LE, 2000, INT J PROD ECON, V67, P201, DOI 10.1016-S0925-5273(00)00059-1; Chang HC, 2004, COMPUT OPER RES, V31, P2079, DOI 10.1016-S0305-0548(03)00166-7; Freimer M, 2006, EUR J OPER RES, V173, P241, DOI 10.1016-j.ejor.2004.11.024; Goyal SK, 2002, INT J PROD ECON, V77, P85, DOI 10.1016-S0925-5273(01)00203-1; Gradshteyn IS, 2000, TABLE INTEGRALS SERI; Hall R.W., 1983, ZERO INVENTORIES; Huang CK, 2004, INT J PROD ECON, V91, P91, DOI 10.1016-S0925-5273(03)00220-2; Karlin S., 1958, STUDIES MATH THEORY; Khouja M, 1999, OMEGA-INT J MANAGE S, V27, P537, DOI 10.1016-S0305-0483(99)00017-1; Khouja M., 2005, International Transactions in Operational Research, V12, DOI 10.1111-j.1475-3995.2005.00515.x; Khouja M, 2003, INT J PROD RES, V41, P1533, DOI 10.1080-0020754031000069616; Maddah B, 2008, INT J PROD ECON, V112, P808, DOI 10.1016-j.ijpe.2007.07.003; Maddah B, 2009, APPL MATH MODEL, V33, P1997, DOI 10.1016-j.apm.2008.05.009; Papachristos S, 2006, INT J PROD ECON, V100, P148, DOI 10.1016-j.ijpe.2004.11.004; PORTEUS EL, 1986, OPER RES, V34, P137, DOI 10.1287-opre.34.1.137; ROSENBLATT MJ, 1986, IIE TRANS, V18, P48, DOI 10.1080-07408178608975329; Ross Sheldon M., 1996, STOCHASTIC PROCESSES; Salameh MK, 2000, INT J PROD ECON, V64, P59, DOI 10.1016-S0925-5273(99)00044-4; SHIH W, 1980, INT J PROD RES, V18, P677, DOI 10.1080-00207548008919699; Silver E. A., 1976, INFOR. Canadian Journal of Operational Research and Information Processing, V14; Wright CM, 1998, OMEGA-INT J MANAGE S, V26, P29, DOI 10.1016-S0305-0483(97)00042-X; YANO CA, 1995, OPER RES, V43, P311, DOI 10.1287-opre.43.2.311
dc.description.citedCount 13
dc.description.citedTotWOSCount 9
dc.description.citedWOSCount 9
dc.format.extentCount 8
dc.identifier.articleNo
dc.identifier.coden IJPCE
dc.identifier.scopusID 76049096494
dc.publisher.address PO BOX 211, 1000 AE AMSTERDAM, NETHERLANDS
dc.relation.ispartOfISOAbbr Int. J. Prod. Econ.
dc.relation.ispartOfIssue 2
dc.relation.ispartofPubTitle International Journal of Production Economics
dc.relation.ispartofPubTitleAbbr Int J Prod Econ
dc.relation.ispartOfVolume 124
dc.source.ID WOS:000275525800004
dc.type.publication Journal
dc.subject.otherAuthKeyword EOQ
dc.subject.otherAuthKeyword Imperfect Quality
dc.subject.otherAuthKeyword Lot Sizing
dc.subject.otherAuthKeyword Random Yield
dc.subject.otherIndex Defective Items
dc.subject.otherIndex Economic Order Quantity Models
dc.subject.otherIndex Economies of Scale
dc.subject.otherIndex Expected Costs
dc.subject.otherIndex Imperfect Quality
dc.subject.otherIndex Inventory Systems
dc.subject.otherIndex Lot Sizing
dc.subject.otherIndex Numerical Results
dc.subject.otherIndex Optimal Lot Size
dc.subject.otherIndex Out-of-Control
dc.subject.otherIndex Production Process
dc.subject.otherIndex Random Yield
dc.subject.otherIndex Economics
dc.subject.otherIndex Numerical Analysis
dc.subject.otherIndex Production Engineering
dc.subject.otherKeywordPlus Production Quantity Model
dc.subject.otherKeywordPlus Setup Cost Reduction
dc.subject.otherKeywordPlus Quality
dc.subject.otherKeywordPlus Inventory
dc.subject.otherKeywordPlus Improvement
dc.subject.otherWOS Engineering, Industrial
dc.subject.otherWOS Engineering, Manufacturing
dc.subject.otherWOS Operations Research and Management Science
dc.identifier.doi http://dx.doi.org/10.1016/j.ijpe.2009.11.029


Files in this item

This item appears in the following Collection(s)

Show simple item record

Search AUB ScholarWorks


Browse

My Account