dc.description |
Project (M.E.M.)--American University of Beirut, Engineering Management Program, 2006. |
dc.description |
Bibliography: leaves 76-78. |
dc.description.abstract |
The earned value concept is the employment of an approach to the management of projects. Each and every project requires that basic concepts be followed and m easurements be considered. However, the earned value measurements are not always applicable gi |
dc.format.extent |
xi, 78 leaves : ill. ( some col.) 30 cm. |
dc.language.iso |
eng |
dc.relation.ispartof |
Theses, Dissertations, and Projects |
dc.subject.classification |
EPj:001372 AUBNO |
dc.subject.lcsh |
Value analysis (Cost control) |
dc.subject.lcsh |
Concrete construction |
dc.title |
Earned value analysis applied to concrete construction - by Samer Khalil Masri |
dc.type |
Student Project |
dc.contributor.department |
Engineering Management Program |
dc.contributor.faculty |
Faculty of Engineering and Architecture |
dc.contributor.institution |
American University of Beirut |